Date Author Record
2004-06-20 jw installed additional guard-ropes to protect workmen in A14 from inadvertantly walking under dirt train moving overhead from A17/A18. [Input: O620JW.j]
2004-06-24 jw created a new level pathway just south of the S berm to provide a safe path between the upper level of excavations (A17/A18) and A12/A14. This should minimize the possibility of material rolling downhill into the abi or onto the excavations to the west. [Input: O625JW.j]